February 8

Ricky and I drove out to the house today. Boy, what a change from the last time we were there! All the interior walls are framed up. There were tubs in the two spare bathrooms, all the windows were in, and the roof was decked. It’s really starting to take shape. Of course, Ricky found a bunch of issues. One thing was the shelf for the water heater was on the opposite side of where the plumbing was. We did stop by the office and talk to Kristi and she said anything we found wrong would be corrected and that Zach hadn’t done his walk-through yet to tell them what was wrong. Stull Inspections will be going for another inspection on February 21. We’ll be there again on the 24th to do a walk-through with Zach and make sure everything looks good before they put the drywall up. Here are some new photos.