First Inspection

We hired Stull Inspections to do 3rd party inspections during the building process. They went out on January 23rd to do the first inspection before the slab is poured. They did find a few issues that needed to be taken care of before the pouring.

All tendons within three inches to supply or DWV piping should be relocated or the pipes should
be protected with a method approved by the engineer.
The vapor barrier has some defects that should be repaired. All rips, tears, holes and seams
should be repaired with an approved tape. Permeation of water vapor through concrete slabs can
cause failure of moisture-sensitive adhesives and may cause delamination, distortion or
discoloration of flooring products. Fill dirt is needed in multiple area before pouring the concrete

Hopefully, these things will get corrected today and the slab can be poured.